
Pacific Blue Reflective Long Lead - 30ft
Still working on your recall? Grab a 30 foot rope leash to give your dog room to roam, while still keeping him safe. Our long lead is also great to use as a tie-out while camping. (*But don't leave dogs unattended on a tie-out!)
- Length: 30 ft
- Made with tightly spun, polypropylene/polyester ⁵⁄₁₆ in rope
- Woven with reflective strands for use in low or no light conditions
-
Aluminum carabiner swivels and locks
- Carabiner width: 1.5 in
- Carabiner length: 2.5 in
- Rated for 3 kN
- Suitable for all dogs
Original: $48.00
-65%$48.00
$16.80More Images


Pacific Blue Reflective Long Lead - 30ft
Still working on your recall? Grab a 30 foot rope leash to give your dog room to roam, while still keeping him safe. Our long lead is also great to use as a tie-out while camping. (*But don't leave dogs unattended on a tie-out!)
- Length: 30 ft
- Made with tightly spun, polypropylene/polyester ⁵⁄₁₆ in rope
- Woven with reflective strands for use in low or no light conditions
-
Aluminum carabiner swivels and locks
- Carabiner width: 1.5 in
- Carabiner length: 2.5 in
- Rated for 3 kN
- Suitable for all dogs
Product Information
Product Information
Shipping & Returns
Shipping & Returns
Description
Still working on your recall? Grab a 30 foot rope leash to give your dog room to roam, while still keeping him safe. Our long lead is also great to use as a tie-out while camping. (*But don't leave dogs unattended on a tie-out!)
- Length: 30 ft
- Made with tightly spun, polypropylene/polyester ⁵⁄₁₆ in rope
- Woven with reflective strands for use in low or no light conditions
-
Aluminum carabiner swivels and locks
- Carabiner width: 1.5 in
- Carabiner length: 2.5 in
- Rated for 3 kN
- Suitable for all dogs























